• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

179 if the board agreed to wave additional insurance beyond $1 million for the project and also fees associated with ensuring that the district would be insured should the contractor walk away from the project.