• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

in order to pay for up to three road projects this year. The projects included in this future bond would be the Highway 382 resurfacing project

the Racine Avenue connection to Highway 382.