• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

with construction phases beginning in 2012. The fine arts addition is slated to be fully operational by the 2013-2014 school year.